-->
 
ESA: AbfallUndAbwasserindustrie

. Material accepting

In many sectors it is important, to hold a process continued on run. To assure that, a prognostic resource stockage is immense important. Foresighted means in this case: To have the correct quantity from the correct material on the correct place. On modern machines it isn't always easy to watch all sizes of the process. Therefore it is important to achieve as much information as required from the process control system or the visualization.

Runs a resource short, the system diagnose this because of the integrated warehouse management and notify directly the plant operator or the purchase of this case. Naturally there can be actuated an automatic order. Is the resource delivered, the system is informed about which order it concerns and can record all necessary entries. By integration of weigh-bridge and acceptance scale also the warehouse management is up-to-date.

Such an integrated system saves both time and resources. Failures like false material delivered or false material in the false silo, can be early detect. Time-consuming evacuations of silos, material removal as mix and false supply are with immediate effect a thing of the past.

Ask now - We are looking forward to advise you and to make you an offer!

-> Ask now

<- Back to: Waste- and Wastewater Industry | Forward to: Material handling ->